Sub-service

Bathrooms

Waterproofing and stonework done properly: dry substrates, silent ventilation, precise falls.

Typical programme: 4–10 weeks • 98% on-time handovers (last 12 months)

Measured drawings M&E coordination Aftercare pack
Finished kitchen with stone worktops and integrated appliances

Scope

Included

  • Measured survey & plans
  • Appliance & services coordination
  • Worktops & splashbacks
  • Ventilation & extraction
  • Protection & logistics

Options

  • Warm-floor heating (adds ~2–3 days)
  • Smart appliances
  • Low-profile lighting schemes

How this runs

1. Discovery

Measurements, drainage and ventilation checks.

2. Survey

Moisture mapping; substrate and fall strategy.

3. Design & Spec

Stone setting-out, brassware, lighting, storage.

4. Build & Handover

Quiet strip-out, verified install, handover with care kit.

FAQs

Is a wet room always possible?

Usually — subject to structure, falls and drain positions. We'll advise options after survey.

How do you minimise disruption?

Quiet site practices, protected routes, scheduled deliveries, and a single neighbour-communications owner.

Discuss your bathroom

Tell us a little about your space and timeline. We’ll respond within two business days.