Finished interior showing clean alignment, controlled junctions and high-tolerance detailing

Wimbledon · New build · Whole-home

Wimbledon new build — demolition to handover.

Full-scope new build delivered from demolition to handover — structural build, services integration and bespoke interiors, with controlled sequencing throughout.

Architect·Designer·Contractor

Programme status — Green

Quick facts

Scope
Whole-home new build — demolition to handover
Sequencing
Structure, services and interiors coordinated without clashes or rework
Key risk
Bespoke joinery and bathrooms delivered to consistent tolerance outcomes
Reporting
Weekly written + photo updates
Variation control
Priced + approved before works

01 — Brief

From demolition to a finished home

This project required end-to-end delivery: demolition, structural build, services integration and bespoke interiors — translating the client’s brief into a durable, functional home with strong future value. Our focus is Central London; we take a select project beyond the core areas where the scope warrants it — this was one.

The focus was controlled sequencing and coordination across major works and high-detail internal packages.

Finished living space showing precise alignment and controlled finishes Project photograph

02 — Challenges

What made it hard

Wimbledon · SW19
  • Sequencing structure, services and interiors without clashes or rework
  • Delivering bespoke joinery and bathrooms with consistent tolerance outcomes
  • Ensuring external works — groundworks, paths, garden — matched durability expectations
  • Keeping decision flow clean across multiple packages and finish selections
Detail view of joinery with consistent reveals Project photograph

03 — Solutions

Control, applied early

  • Programme built around critical path and long-lead items, reviewed weekly
  • Services coordination locked early to protect ceiling lines and joinery outcomes
  • Bespoke kitchen, wardrobes and wet areas delivered through staged inspections
  • Durable concrete groundwork designed for longevity in stairs and pathways
  • Decisions and variations tracked clearly — approvals secured before work proceeded
Final space showing controlled lines and levels Project photograph

04 — Programme & control

The paper trail

Full-scope delivery was managed through structured weekly reporting and decision tracking, so nothing sat unresolved. Risks and lead times were monitored weekly — keeping the client informed and the programme stable.

How we work Request a sample report

Weekly reporting — this project Every Friday
Programme status
Green
Key decisions tracked
14 — fixtures + joinery finish
Variations log
Priced + approved before works
Risks
Lead times monitored weekly
Photos tagged by area Progress + constraints noted Snag / close-out tracked

06 — Outcome

Outcome

Delivered from demolition to handover — every decision and variation on the record.

A whole-home new build delivered from demolition to handover with bespoke interiors and durable external works — executed with controlled sequencing and clear project management. The final result balances aesthetic ambition with functional longevity and consistent finish quality. The programme closed Green, with every decision and variation on the record.

Please add your name.
Please check your email address.

Your enquiry references this case study automatically. Response target: within 2 working days — privacy policy.

Book a 30-minute call