How we work · Central London
Six steps. No drift.
Controlled delivery, clear reporting, and one major project at a time — so quality and programme don’t drift.
First call → handover·One team, owner-led
Weekly written reporting as standard
- Capacity 2026 — one major project
- Weekly written + photo reporting
- Variations agreed before works
- Responses within 2 working days
The programme
A clear process from first call to handover
-
Step 01
30-minute call
Confirm fit on scope, area and constraints. We work to understand objectives, access and constraints — and identify the fastest next step.
-
Step 02
Drawings
Buildability, lead times and risk reviewed early — before drift starts. Issues get flagged now, while they’re still cheap, and expectations are aligned.
-
Step 03
Tender + programme
Clear assumptions, sequencing logic, and practical constraints built in.
Transparent breakdownProgramme aligned to lead times -
Step 04
Pre-start logistics
Access, protection, neighbours, deliveries and site setup planned properly — protection strategy and working hours confirmed before anyone mobilises.
-
Step 05
Delivery + weekly reporting
Progress, decisions, risks and photos — structured, not noisy.
Weekly updateLook-aheadDecision list -
Step 06
Handover + snagging + follow-up
Structured close-out to protect long-term quality — snagging, sign-offs and documentation where applicable.
Communication you can rely on
Structured, not noisy
One written update every week, in the same format, with the photo record organised by area. Decisions come with deadlines; risks come with mitigations.
We respond within 2 working days.
- Progress summary
- What moved this week
- Next-week plan
- Look-ahead + sequencing
- Decisions required
- Framed, with deadlines
- Risks
- With mitigations
- Photo record
- Organised by area
Variation control
No surprises
A variation is any change to scope, design, specification — or hidden conditions discovered on site. Every one follows the same path:
-
1
Documented
The change is written down — what, where, why.
-
2
Priced
Cost impact confirmed before anything moves.
-
3
Programme checked
Any impact on the schedule confirmed alongside cost.
-
4
Agreed in writing
Only then does work proceed.
“Work proceeds once it’s agreed in writing — unless safety-critical or to prevent damage.”
Two exceptions, and only those two.
Risk, surfaced early
We flag issues early — before they become delays
Buildability and sequencing decisions get pushed forward, not discovered mid-programme. The recurring risk areas we watch hardest:
- Structural discovery and sequencing implications
- Services conflicts
- Waterproofing and wet-area detailing
- Joinery tolerances and alignment control
- Access constraints and building management
- Lead-time exposure on long-order items
Practicalities
Questions we’re asked
High-detail refurbishments where control and communication matter most — architect-led terraces and large flats are our core work.
Occasionally, where it’s a strong fit — but our core work is whole-home refurbishment.
Sometimes — it depends on scope, services shut-downs, access and programme risk. You’ll get an honest view at the first call, not a sales answer.
Early logistics planning, constraint-based sequencing, tight trade coordination and weekly decision tracking — slippage gets flagged, not hidden.
Documented, priced and agreed in writing before work proceeds — the only exceptions are safety-critical work or preventing damage.
Drawings and specification, access constraints, a target start date, and clear scope direction.
Yes — the whole process is structured to protect design intent, with buildability input early. See For architects.
Yes. Weekly written reporting with documented decisions and a photo record organised by area keeps remote clients fully informed.