For architects & designers · Central London
A contractor who protects the drawing.
We protect design intent, solve buildability early, and report clearly — so you can focus on design and client outcomes.
Capacity 2026 — one major project·No volume pipeline
20+ years senior site leadership
- Design intent protected
- Buildability flagged early
- Weekly reporting you can forward
- Variations agreed before works proceed
The working relationship
What you can expect
- Design intent protection through sequencing, tolerance control and inspection points
- Buildability input early — before details become problems
- Clear programme logic and trade coordination
- Variation management: documented, priced, approved before work proceeds
- Calm client communication you can forward without rewriting
- Senior site leadership — no rotating supervision
In practice
How we protect design intent
Buildability intelligence, early
Drawings and spec reviewed for the risks that cost design intent later:
Sequencing around critical junctions
Defined inspection points, benchmarks agreed before roll-out, and controlled trade sequencing where tolerances matter most.
Change control that protects relationships
Costs never ambush the client — or you.
“No variation proceeds without written scope, cost and programme agreement.”
Radical transparency
Reporting you can forward
Every Friday, the same structure. Written for the client as much as for you — nothing to translate, nothing to soften.
Your drawing register and RFI process can plug straight in; if none exists yet, we bring the structure without the admin overload.
- Programme status
- Traffic light
- 2-week lookahead
- Next actions + sequencing
- Progress summary
- What changed this week
- Decisions needed
- Owner / architect inputs
- Risks
- New · active · mitigated
- Variations log
- Submitted / approved / pending + impact
- Photos
- Tagged by area, fast review
Optional, as needed
- Programme status
- Green
- Lookahead
- Staged conservation sign-offs
- Decisions
- Fixtures + joinery finish — tracked to deadline
- Risk watched
- Heritage detailing tolerances — mitigated
- Variations
- Priced + approved before works
- Photos
- By area — joinery · wet areas · services
Before the build
Tender, honestly priced
Tender approach
We price best — and hold prices best — when these are clear:
- Latest drawings, with revision status
- Specification intent
- Known constraints — access, neighbours, building management, working hours
- Decision makers — who signs off what, and how quickly
Early Contractor Input
If design is progressing and you want clarity before tender stress, ECI gives early visibility on buildability, lead times and sequencing risk.
- Buildability review + risk register
- Budget ranges by element
- Lead-time schedules
- Programme logic with decision deadlines
Ideal for architect-led projects where the client wants confidence before commitment.
Fit & process
The practical details
Coordination & QA
- Drawing registers + RFI process
- Benchmarks & sign-offs before roll-out
- Inspection points at critical junctions
- Surface protection strategy
Best fit
- Architect-led terraces & large flats
- High-detail scope, critical junctions
- Real tolerance requirements
- Chelsea, Belgravia, Fulham + surrounding
What we need
- Latest drawings, revision status
- Specification intent
- Decision-maker confirmation
- Constraints — hours, access, neighbours
Insurance & site assurance
- Public liability
- £5m
- Employers’ liability
- £10m
- Health & safety
- Written policy · RAMS per project
- CDM 2015
- Projects run in line with duties
- Site team
- Inductions as standard · CSCS-carded
- Certificates
- Available on request
Reference
“Buildability issues were picked up early, not passed down the line.”
Questions architects ask
Before you send drawings
Our preference is architect-led. We are at our best executing and protecting a designer’s intent — we flag buildability and cost implications early, but we don’t replace the design team.
We raise RFIs rather than guess. Gaps become logged questions with owners and deadlines — not assumptions that resurface later as variations.
Yes — with benchmarks and sign-offs agreed before roll-out. Critical junctions get defined inspection points, and surfaces get a protection strategy from day one.
Consistent weekly updates in the same structure, decisions framed clearly with deadlines, and no unapproved costs — every variation is priced and agreed before work proceeds.
One major project at a time. For 2026 that means your project gets senior, owner-led attention for the full programme — controlled delivery, no volume pipeline.
A 30-minute call with your early-stage drawings. We assess fit and risk honestly and advise the best next step — and we’ll tell you if we’re not the right fit.