A contractor who protects the drawing.

We protect design intent, solve buildability early, and report clearly — so you can focus on design and client outcomes.

Capacity 2026 — one major project·No volume pipeline

20+ years senior site leadership

  • Design intent protected
  • Buildability flagged early
  • Weekly reporting you can forward
  • Variations agreed before works proceed

The working relationship

What you can expect

01 — Expectations
  • Design intent protection through sequencing, tolerance control and inspection points
  • Buildability input early — before details become problems
  • Clear programme logic and trade coordination
  • Variation management: documented, priced, approved before work proceeds
  • Calm client communication you can forward without rewriting
  • Senior site leadership — no rotating supervision

In practice

How we protect design intent

02 — Method
№ 1

Buildability intelligence, early

Drawings and spec reviewed for the risks that cost design intent later:

Set-out constraintsJunction risksSequencingLead-time exposureLogistics
№ 2

Sequencing around critical junctions

Defined inspection points, benchmarks agreed before roll-out, and controlled trade sequencing where tolerances matter most.

№ 3

Change control that protects relationships

Costs never ambush the client — or you.

“No variation proceeds without written scope, cost and programme agreement.”

Radical transparency

Reporting you can forward

Every Friday, the same structure. Written for the client as much as for you — nothing to translate, nothing to soften.

Your drawing register and RFI process can plug straight in; if none exists yet, we bring the structure without the admin overload.

Request a Weekly Report example

The weekly pack Every Friday
Programme status
Traffic light
2-week lookahead
Next actions + sequencing
Progress summary
What changed this week
Decisions needed
Owner / architect inputs
Risks
New · active · mitigated
Variations log
Submitted / approved / pending + impact
Photos
Tagged by area, fast review

Optional, as needed

RFI log extract Lead-time tracker Change-control summary
From the record Belgravia listed terrace
Programme status
Green
Lookahead
Staged conservation sign-offs
Decisions
Fixtures + joinery finish — tracked to deadline
Risk watched
Heritage detailing tolerances — mitigated
Variations
Priced + approved before works
Photos
By area — joinery · wet areas · services
Entries drawn from the Belgravia listed terrace project record — 10 decisions tracked; programme closed Green.

Before the build

Tender, honestly priced

03 — Engagement

Tender approach

We price best — and hold prices best — when these are clear:

  • Latest drawings, with revision status
  • Specification intent
  • Known constraints — access, neighbours, building management, working hours
  • Decision makers — who signs off what, and how quickly

Early Contractor Input

If design is progressing and you want clarity before tender stress, ECI gives early visibility on buildability, lead times and sequencing risk.

  • Buildability review + risk register
  • Budget ranges by element
  • Lead-time schedules
  • Programme logic with decision deadlines

Ideal for architect-led projects where the client wants confidence before commitment.

Fit & process

The practical details

04 — Working together

Coordination & QA

  • Drawing registers + RFI process
  • Benchmarks & sign-offs before roll-out
  • Inspection points at critical junctions
  • Surface protection strategy

Best fit

  • Architect-led terraces & large flats
  • High-detail scope, critical junctions
  • Real tolerance requirements
  • Chelsea, Belgravia, Fulham + surrounding

What we need

  • Latest drawings, revision status
  • Specification intent
  • Decision-maker confirmation
  • Constraints — hours, access, neighbours

Insurance & site assurance

Public liability
£5m
Employers’ liability
£10m
Health & safety
Written policy · RAMS per project
CDM 2015
Projects run in line with duties
Site team
Inductions as standard · CSCS-carded
Certificates
Available on request

Reference

“Buildability issues were picked up early, not passed down the line.”

— Architect, Chelsea

Questions architects ask

Before you send drawings

05 — FAQ

Our preference is architect-led. We are at our best executing and protecting a designer’s intent — we flag buildability and cost implications early, but we don’t replace the design team.

We raise RFIs rather than guess. Gaps become logged questions with owners and deadlines — not assumptions that resurface later as variations.

Yes — with benchmarks and sign-offs agreed before roll-out. Critical junctions get defined inspection points, and surfaces get a protection strategy from day one.

Consistent weekly updates in the same structure, decisions framed clearly with deadlines, and no unapproved costs — every variation is priced and agreed before work proceeds.

One major project at a time. For 2026 that means your project gets senior, owner-led attention for the full programme — controlled delivery, no volume pipeline.

A 30-minute call with your early-stage drawings. We assess fit and risk honestly and advise the best next step — and we’ll tell you if we’re not the right fit.